Date:    7-8-2020
Number of Hours:    3.00
Brief Description:    Final Sized All FW Holes
Final sized all the Firewall holes.

Test Fit Firewall Recess. Tight fit, but it eventually went into place.

Drilled last two 3/32 holes in both F-601P Spacers. Had to remake one since the first one rotated when I was backdrilling.


Next:
- Drill 3/16 holes in both WD-602 Upper Engine Mounts
- Fabricate and match drill F-601Z Aux Fuel Pump Firewall Doubler
- Deburr everything
- Dimple and C/S as required.