| Date: |
12-28-2017 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Finished drilling HS. |
|
|
Finished "Drilling the Horizontal Stabilizer." Disassembled parts in preparation of debur, edge cleaning, and priming. Made one oops drill "dimple" in one rib (HS00005 - Right Aft Flange Aft Side), but not through material. Clamp slipped during drilling. Took pictures for documentation. See attachments. Everything else went smoothly. |
||