| Date: |
12-27-2017 |
|
| Number of Hours: |
10.00 |
|
| Brief Description: |
Finsh FS and Begin Drilling HS |
|
|
Finished "Front Spar Assembly" by doing the last step. This is deburring, Dimpling, and Countersinking HS702 and HS710/714. The right dimple on HS714 is a little oversized. The depth stop was not locked down and it ended up going deeper than intended. May need to fill, sand, redrill and re-countersink to ensure rivet doesn't pull through when setting. Finished "Preparing the Ribs." Began "Drilling the Horizontal Stabilizer." LOTS of Cleco and UN-Cleco..... Poor hands. |
||