| Date: |
12-13-2009 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
INSTALL STEIN AIR PANEL |
|
|
THE PANEL WAS BUILT BY STEIN AIR. I HAD THE PAINT IN OUR BODY SHOP SO TO MAKE A GOOD MATCH I SHIP THE PAINT TO STEIN. THEY DID A GREAT JOB ON THE PANEL. GREAT PEOPLE TO WORK WITH. |
||