Date:    12-13-2009
Number of Hours:    2.00
Brief Description:    INSTALL STEIN AIR PANEL
THE PANEL WAS BUILT BY STEIN AIR. I HAD THE PAINT IN OUR BODY SHOP SO TO MAKE A GOOD MATCH I SHIP THE PAINT TO STEIN. THEY DID A GREAT JOB ON THE PANEL. GREAT PEOPLE TO WORK WITH.