| Date: |
8-25-2019 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
More More Right Flap |
|
|
The Right Flap was completely disassembled. The Spar and AEX Wedge were cleaned and primed. All nine Ribs were dimpled The Trainling Edge of each rib required that I make a special female dimple die to fit into the tight space unreachable with a squeezer. All of the Hinge Bracket parts fr the Right Flap were cleaned in AlumiPrep and treated with Alodine. I started to rivet the Bracket Assemblies for the Right Flap with a squeezer... the rest of the rivets will need to be driven and bucked. |
||