| Date: |
8-22-2019 |
|
| Number of Hours: |
5.50 |
|
| Brief Description: |
Right Flap Work |
|
|
Continuing work on the Right Flap. The same procedure here as was followed with the Left Flap, with the Top Skin Clecoes extending through 5/8" holes in the table. My table now looks like Swiss Cheese. All parts were assembled, clecoed and match-drilled including the AEX Wedge in the Trailing Edge. Now, both Flaps are at the same point in assembly. |
||