| Date: |
7-12-2019 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Aileron Bracket Work |
|
|
Started working on the W913 and W914 Aileron Bracket Assemblies. I had to fabricate two small Aileron Control Stops from stock aluminum angle. I prepared two of the four needed assemlies today. All parts were match-drilled, deburred, cleaned with AlumiPrep and Alodined. |
||