| Date: |
6-2-2019 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Fitting R Leading Edge and R Tank |
|
|
The W919 Joiner Strip was measured and drilled into position on the R L.E. Now I can continue with the Fuel Tank. After mounting the R Tank, I drilled through the Tank Skin into the W919 Strip. I match-drill all the Skin->Rib and Skin->Baffle holes on the R Tank. All of the Skin->Baffle holes had to be countersunk per instructions to insure a better Baffle seal when finishing the tank. Removed the Baffle and all of the Attach Brackets. |
||