Date:    12-6-2018
Number of Hours:    2.00
Brief Description:    Left Elevator
Began working on the Left Elevator. Clecos and match-drilling. The instructions say that this side will be more difficult than the Right side. Not yet, but who knows what the trim tab will bring.