| Date: |
12-6-2018 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Left Elevator |
|
|
Began working on the Left Elevator. Clecos and match-drilling. The instructions say that this side will be more difficult than the Right side. Not yet, but who knows what the trim tab will bring. |
||