| Date: |
10-5-2019 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Installed Right Tank Baffle and Z Brackets |
|
|
One thing to make sure is to follow the directions on placing thin proseal on the rib ends and a line of proseal right after the rivet lines for the back baffle. |
||