| Date: |
9-30-2019 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Installed root rib, fuel vent and tank bracket |
|
|
Installed the tank bracket with the final root rib. Also created the fuel vent line and installed the plastic bushings. |
||