| Date: |
7-27-2019 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Dimpled Fuel Tanks |
|
|
Used a dremel tool and a 120 grit vibrating pad to roughen the mating surfaces inside the skins. I taped off the lines and made quick work of it. Dimpling of the skins was all done on my DDRT2. None of the number 8 dimples were done with a squeezer per plans. |
||