| Date: |
11-21-2018 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Finished VS Stabilizer |
|
|
Finished the riveting of the VS. This was rather easy except near the hinges. Some of those needed riveting with the rivet gun since the squeezer could not get close enough with the hinge in place. |
||