Date:    8-27-2014
Number of Hours:    12.00
Brief Description:    Wiring Harness Installation
Continued installing wiring throughout the Fuselage.
Installed and tested the Wing Pint locking indicator Reed Switches.
Installed the Push-to-Talk buttions and wiring on the control sticks.