| Date: |
8-27-2014 |
|
| Number of Hours: |
12.00 |
|
| Brief Description: |
Wiring Harness Installation |
|
|
Continued installing wiring throughout the Fuselage. Installed and tested the Wing Pint locking indicator Reed Switches. Installed the Push-to-Talk buttions and wiring on the control sticks. |
||