| Date: |
1-30-2006 |
|
| Number of Hours: |
9.00 |
|
| Brief Description: |
Elevator work |
|
|
Worked on the elevator frames and match drilled the right elevator. I deviated from the instructions. The lead counter weights were a pain to install so I decided not to dissasemble after fit up. Everything ok now. |
||