Date:    1-30-2006
Number of Hours:    9.00
Brief Description:    Elevator work
Worked on the elevator frames and match drilled the right elevator. I deviated from the instructions. The lead counter weights were a pain to install so I decided not to dissasemble after fit up. Everything ok now.