| Date: |
1-17-2006 |
|
| Number of Hours: |
10.00 |
|
| Brief Description: |
Horzizontal stab |
|
|
Did a little remodel in the shop to make room for this longer piece and enventually the wings. Assembled the HS spars/ribs and attached the skin. Match drilled the skin and disassembled in preperation for riveting. Long day. Cat slept. |
||