Date:    9-27-2006
Number of Hours:    6.00
Brief Description:    More elevator work and misc
Worked on elevator fit and finish today. Adjusted the connector link lengths so that the pivot points are correct. I also added rivets to the Leading edges so that edge is pulled down the entire length of the elevators. I also redid some rivets on the left wing along the inner spar that I was not happy with.