| Date: |
9-27-2006 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
More elevator work and misc |
|
|
Worked on elevator fit and finish today. Adjusted the connector link lengths so that the pivot points are correct. I also added rivets to the Leading edges so that edge is pulled down the entire length of the elevators. I also redid some rivets on the left wing along the inner spar that I was not happy with. |
||