| Date: |
6-16-2008 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Fuse assembly - 121 - Rollbar wrap up and canopy l |
|
|
Installed the Rollbar today and riveted the upper attach frame to the rollbar. I also installed the canopy latch bar since the rollbar is in. I also installed the Main Elevator pushrod today. Lots of little things got done today. |
||