Date:    4-22-2008
Number of Hours:    4.00
Brief Description:    Fuse assembly - 116 - Cabin Frame/Rollbar construc
More cabin frame fitup work today. Painted the F-732A frame and installed the coat rack bracket. Deburred the hold down fittings and continued the match drilling process. Slow time consuming work.