| Date: |
3-17-2008 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Fuse assembly - 104 - Horz stab fairing |
|
|
Installed the nutplates that hold on the upper Horz Stab Fairing. I also fitup the lower fairing matching it to the upper fairing. |
||