| Date: |
3-9-2008 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Fuse assembly - 100 - Horz Stab installation |
|
|
Installed the horzontal stabilizer today. Took my time and rechecked all parameters to ensure that the stab is straight and square with 0 deg incidence. The drawing call for 3/16" shim to get the zero incidence. I ended up using 1/4" to get the incidence as close to zero as possible. |
||