Date:    3-9-2008
Number of Hours:    6.00
Brief Description:    Fuse assembly - 100 - Horz Stab installation
Installed the horzontal stabilizer today. Took my time and rechecked all parameters to ensure that the stab is straight and square with 0 deg incidence. The drawing call for 3/16" shim to get the zero incidence. I ended up using 1/4" to get the incidence as close to zero as possible.