| Date: |
9-2-2007 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Fuse assembly - 41 - Canopy Latch/Fuel System |
|
|
Wrapped up the canopy latch system. Riveted everything in place. Installed the 90 deg bulkhead fittings for the fuel supply and Fuel injection return lines. Finished 1/2 of the 3/8 tubing fitup to the fuel valve. |
||