Date:    9-2-2007
Number of Hours:    8.00
Brief Description:    Fuse assembly - 41 - Canopy Latch/Fuel System
Wrapped up the canopy latch system. Riveted everything in place. Installed the 90 deg bulkhead fittings for the fuel supply and Fuel injection return lines. Finished 1/2 of the 3/8 tubing fitup to the fuel valve.