| Date: |
12-10-2006 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Installed AOA static ports |
|
|
Installed top and bottom AOA static ports. Secured the tubing to the wire run. This pretty much wraps up the wing construction. Not much else to do. Waiting for the fuse now. I am also working on electrical schematics. |
||