| Date: |
8-13-2006 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Finshed Pitot tub installation work |
|
|
Installed the pitot fittings. I installed an extra pitot line incase I decide to use a AOA pitot in the future. I also ran a 16 gage power wire incase I decide to install a heated pitot in the future. I also started riveting the access hatch nut plates. I got 4/6 completed. |
||