| Date: |
6-14-2006 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Installed last two ribs |
|
|
Riveted the last two ribs in place. I also gooped up the vent line fittings, I never want to open these tanks again. This batch of proseal set up very quickly, luckily I was ready for it. |
||