Date:    4-7-2019
Number of Hours:    5.20
Brief Description:    Modifying the Left Tank for Flop Tube
Tonight I did all the modifications to the left tank needed to install the flop tube. I made the anti hang up brackets and the trap door and then riveted the anti hang up brackets to the inboard end rib and the next rib. I also riveted a plate over the hole in the next inboard rib.