| Date: |
10-7-2018 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Finishing the Elevators |
|
|
I began rolling the leading edges of the elevator. I used a closet rod with sockets JB welded to the inside as my rod. It worked really well. I was able to roll the edges without getting the roll too tight and had plenty of leverage with the socket wrenches. |
||