| Date: |
5-7-2018 |
|
| Number of Hours: |
2.60 |
|
| Brief Description: |
Riveting the Horizontal Stabilizer |
|
|
Tonight I kept riveting. I bolted the HS-411PP to the spar. I torqued the bolts to 23 in-lbs. I also riveted the HS-810-1, HS-814-1 and HS-00003 to the HS-702 spars. Most of this riveting was done with the rivet gun. I found that my pneumatic squeezer would not squeeze 4-7 rivets for some reason. I’m sending it back to the manufacturer to be worked on. |
||