| Date: |
3-29-2009 |
|
| Number of Hours: |
12.00 |
|
| Brief Description: |
Completed the Horizontal Stablizer |
|
|
Completed skinning the horizontal stabilizer. Also installed both the stab tips, which went much better than the vertical one (with the experience I gained from the vertical stab). Also, the method I mentioned yesterday about how I was going to line up the elevator worked like a charm – the elevator is perfectly aligned with the stab. All in all, the vertical stab turned out pretty well. Once the tips were on I got back to polishing. Was able to get the rudder and vertical stab polished pretty decently with the F9 polish. Still have to go over it with the C and S grades. |
||