| Date: |
10-7-2012 |
|
| Number of Hours: |
5.50 |
|
| Brief Description: |
Left Elevator |
|
|
manufactured Stifners, matchdrilled deburred, sanded, and labled location, Finnished main spar and manufactured the Trim inspection pannel. Also sanded and deburred aft edges of trim spar. |
||