Date:    10-7-2012
Number of Hours:    5.50
Brief Description:    Left Elevator
manufactured Stifners, matchdrilled deburred, sanded, and labled location, Finnished main spar and manufactured the Trim inspection pannel. Also sanded and deburred aft edges of trim spar.