| Date: |
2-12-2014 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Wing and Flap work |
|
|
Secured some additional wiring in wings. Made the cut-out on right and left sides of baggage area. These are two cutouts through the bottom of the plane fuselage to accept the flap connecting rods. |
||