| Date: |
4-10-2014 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
|
|
|
Finished the fitting of the prop spinner. torqued the prop bolts to 45 ft. lbs. (still need safety wire). Also will need to make 2 gap seals behind the prop blades to fill in the gaps from original cutting of the spinner. I will prime the spinner before final install. After removing the 4 top spark plugs, I took the opportunity to crank the engine. I first loosened the oil pressure line at the firewall connection and purged the air out. Primed both wing tips where riveting and fiberglass work had been. |
||