Date:    5-16-2013
Number of Hours:    4.00
Brief Description:    Air Inlet Ducts
Installed the air inlet ducts on the upper cowl. Roughed up all the fiberglass. Drilled holes, added resin, clecoed the ducts to dry overnight.