| Date: |
5-16-2013 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Air Inlet Ducts |
|
|
Installed the air inlet ducts on the upper cowl. Roughed up all the fiberglass. Drilled holes, added resin, clecoed the ducts to dry overnight. |
||