| Date: |
10-3-2012 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Canopy Prep for Sika seal |
|
|
Removed the canopy and frame from fuselage to prep for sikaflex application around the front canopy frame. Sanded aluminum and canopy and taped application area. Sikaflex went smoothly and I now have the canopy glued and bolted to the frame. I also decided to replace the fuel line between the F.I. Pump and the firewall bulkhead fitting. Installed a firewall doubler for the bulkhead fitting, also. |
||