Date:    10-3-2012
Number of Hours:    6.00
Brief Description:    Canopy Prep for Sika seal
Removed the canopy and frame from fuselage to prep for sikaflex application around the front canopy frame. Sanded aluminum and canopy and taped application area. Sikaflex went smoothly and I now have the canopy glued and bolted to the frame.

I also decided to replace the fuel line between the F.I. Pump and the firewall bulkhead fitting. Installed a firewall doubler for the bulkhead fitting, also.