| Date: |
1-30-2012 |
|
| Number of Hours: |
14.00 |
|
| Brief Description: |
Rudder/Brake pedal assembly |
|
|
This has been actually 2 days of work. I spent a lot of time reading throught the fuselage section of the manual. The manual is written as if you purchased a "standard" Fuselage Kit. I purchased a "Quick Build" kit; which has much of the work already finished. Thus, you must read and understand what has been accomplished and find a point to start from. I assembled the brake/rudder pedal assembly and installed it with several adjustment positions; giving me a 4 inch fore and aft movement of the assembly. I have it in the most forward position (long legs). The seats are also adjustable approximately 3". I also installed the 1/4 inch pitot tube hardware in the left wing. I have also finished the elevator push rod tubes (2) and bellcrank. They were primed inside and out and are stored for now. |
||