| Date: |
11-1-2008 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
made upper and lower elevator and drilled doubler |
|
|
drilled the doubler to the top and bottom Horns. cut the L angles, marked their placement and drilled them to the elevator. |
||