Date:    5-6-2008
Number of Hours:    2.00
Brief Description:    drilled and cleco'd 6T2-3 Rear Spar attachment
realligned the Rear Spar attachment and ensured it was square to the bottom of the spar.

clamped in place with three clamps.

drilled 25 holes, cleco 5 as per drawing