Date:    5-4-2008
Number of Hours:    2.00
Brief Description:    Drilled Shim and cleco'd to the rear spar.
marked the center line on the Shim 6T2-6HD

clamped the shim to the spar...lined up the top edge of the shim to bottom edge of the doubler.

drilled and cleco'd 4 holes thru the shim.

filed a radius on the 6T2-3 attachment to allow max clearance against the doubler 6T1-6HD.

clamped the 6T2-3 ready for drilling.