| Date: |
5-4-2008 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Drilled Shim and cleco'd to the rear spar. |
|
|
marked the center line on the Shim 6T2-6HD clamped the shim to the spar...lined up the top edge of the shim to bottom edge of the doubler. drilled and cleco'd 4 holes thru the shim. filed a radius on the 6T2-3 attachment to allow max clearance against the doubler 6T1-6HD. clamped the 6T2-3 ready for drilling. |
||