Date:    5-3-2008
Number of Hours:    4.00
Brief Description:    attachment 6T2-2 and 6T2-1 to front spar
clamped the plywood template to the front spar matching the center line

clamped the attachment doubler 6T2-2 at the ends of the plywood template

verified edge distance of the spar to doubler

drilled and cleco'd 6T2-2 (used #30 drill..undersize)

clamped the front spar attachment 6T2-1 to the side of the atachment doubler 6T2-2

ensured the tops lined up

drilled and cleco'd 6T2-1

disassembled the 6T2-2 and drew a rivet line, and marked three rivet drill points

re-cleco'd and drilled the 6T2-1 to 6T2-2