| Date: |
4-27-2008 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
drilled the doublers on the front spars |
|
|
raised the spar for drilling. drilled the doublers starting in the middle and cleco'd every other hole. then drilled between the cleco's (used a #30 drill bit...undersized as per instructions) extended the rivet line with a square for the attachment doubler 6T2-1 |
||