| Date: |
4-20-2012 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Drilled Flange Holes and Completed Assembly |
|
|
Drilled flange holes on both sides utilizing a wood block for back pressure. Additionally, I finished assembling the left horizontal stabilizer. Tomorrow we drill! |
||