| Date: |
3-29-2012 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Inventory and Drilled Rear Spar (HS) |
|
|
After a long layoff, my father and I inventoried the empennage kit. Additionally, we drilled the front spar doubler. Next step is to make the aluminum angles; however, I need a drill press and a metal cutting blade (high tooth count) for my band saw. No pictures due to assistant being pre-occupied with kids. |
||