| Date: |
3-9-2008 |
|
| Number of Hours: |
7.75 |
|
| Brief Description: |
Flap Brackets & Fairings |
|
|
Drilled Inbd & Outbd flap gap fairings to ribs. Clecoed flap & aileron fairings then reamed and drilled al holes. Riveted aileron hinge brackets to both wings. Beth also scotchbrighted aileron stiffeners. Paul 4.5 hrs Beth 3.25 hrs |
||