| Date: |
2-11-2008 |
|
| Number of Hours: |
3.25 |
|
| Brief Description: |
Misc Tank Prep |
|
|
Scotchbrited the rear baffle. Fabricated the fuel pickup assembly and drilled the anti-rotation brackets. cut vent line to rough length and fluted one end. Fabricated both aileron control stops. Prepped the aileron brackets for priming. |
||