Date:    2-11-2008
Number of Hours:    3.25
Brief Description:    Misc Tank Prep
Scotchbrited the rear baffle.

Fabricated the fuel pickup assembly and drilled the anti-rotation brackets.

cut vent line to rough length and fluted one end.

Fabricated both aileron control stops.

Prepped the aileron brackets for priming.