| Date: |
1-29-2008 |
|
| Number of Hours: |
9.50 |
|
| Brief Description: |
Proseal Tank Baffle |
|
|
This made for a very long night... Put a bead of Proseal around the perimeter of the tank skin then buttered up the baffle itself. Placed the baffle in the tank frame and put a cleco in every hole. Used the pneumatic squeezer to squeeze the rivets around the edge the put the spar attach brackets in with pop rivets. Paul 5 hours Beth 4.5 hours |
||