| Date: |
11-7-2007 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Elevator - L & R Pre-assembly |
|
|
Completed frame assembly for both Elevators. Steps done: 1). Placed frame in Skin and clecoed, 2). Match drilled all holes, 3). Connected Control Horns, 4). Drilled both Trailing Edge Wedges and countersunk, |
||