| Date: |
1-5-2002 |
|
| Number of Hours: |
280.00 |
|
| Brief Description: |
Assembly of Right and Left Wings |
|
|
Work on wings performed gradually over 4 year period Assembled right and left frames January 2002 Interior of wing coated with Zinc Chromate primer Aeroflash strobe transformers placed in Right & Left wings. All wiring placed through the leading edge of the Wing |
||