| Date: |
9-25-2008 |
|
| Number of Hours: |
5.22 |
|
| Brief Description: |
601 Fuselage construction (#115) |
|
|
Drawn sketch off cool air intake for cabin and did cutout and rounded edges..Fabricated and drilled holes for gusset L/H and R/H for second tube frame.Assisted Anton in drilling up side off aft top skin and the fabrication off first and second tube frame.. |
||