Date:    8-9-2003
Number of Hours:    3.00
Brief Description:    nose gear wheel pant, pilot pal and pilot tube
ran pilot tube down nose gear shaft & into wheel pant, installed wheel pant, installed pilot pal into wheel pant, reconnected stearing linkage