Date:    8-13-2005
Number of Hours:    6.00
Brief Description:    MIsc panel work and trib tab work
Installed battery, installed HOBBS meter into instrument panel, drilled holes in airleron for trim tab hindge. Fixed and cleaned up some lose wires behind panel.